What is lag in scheduling?

Prepare for the PMI GMetrix Test with comprehensive quizzes. Utilize flashcards, practice multiple choice questions, and study detailed explanations to excel in your exam. Elevate your confidence and get exam ready today!

Multiple Choice

What is lag in scheduling?

Explanation:
Lag is a wait time between activities. When two tasks are linked, a lag adds a delay after the first finishes before the second can start, modeling real-world constraints like waiting for materials, inspections, or approvals. This is different from starting a task earlier (lead) and different from the total float, which measures how long a path can slip without delaying the project finish. So, lag units the dependency with a pause, keeping the schedule aligned with those delays.

Lag is a wait time between activities. When two tasks are linked, a lag adds a delay after the first finishes before the second can start, modeling real-world constraints like waiting for materials, inspections, or approvals. This is different from starting a task earlier (lead) and different from the total float, which measures how long a path can slip without delaying the project finish. So, lag units the dependency with a pause, keeping the schedule aligned with those delays.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy